From 16 to 17 July, Arctic Valley Road will be closed between 5th and 6th Streets as JBER performs upgrades and maintenance on the road. If you plan on exiting through the Arctic Valley gate, please follow all posted instructions.
Traffic Detour
Through traffic (heading to Arctic Valley Gate) will detour through the cottonwood neighborhood, down Patriot Parkway. Signs will be posted throughout the area, guiding cars through the detour.
Details
Date: 16 July to 17 July
Action Required: Follow all instructions and posted signs. Please drive slowly and carefully through neighborhoods.
Purpose: Construction on Arctic Valley Road.
Contact: TSgt Cummings | 907-552-5445