WHY THIS INFRASTRUCTURE WORK IS IMPORTANT
PRESENT DAY
The Denali neighborhood has seen a substantial uptick in water intrusion work orders over the past two winters (starting in winter of 2022). The water intrusion consistently occurs in similar locations in each home.
AREAS OF CONCERN
The lower roof to wall transitions as well as window drip caps are an entry point for moisture and require repair. Flashing as well as the ice and water shield is not suitable for preventing water intrusion and requires repair.
Shingle repair and full roof replacement is not required; shingles are in good condition.
WHAT TO EXPECT
This project will have a moderate impact on your day to day. We’ll do our best to minimize the impact, by providing ample notice via flyer and email.
TIMELINE
Hours: Monday-Friday, 8 AM to 5 PM.
Each building will take approximately 3 business days to complete.
Day 1: Remove siding. Remove shingles.
Day 2: Remove ice and water shield and flashing. Install new step flashing, ice & water shield and shingles
Day 3: Install window drip cap. Reinstall Siding.
You will receive a flyer approximately 5 days prior to commencement of the job.
EXTERIOR OF HOME
Contractors will be performing work on your roof. For this reason, access to your driveway, back yard, and roof will be required.
Additionally, the contractor will be using hammers and pneumatic nailers, which will result in excess noise.
IN HOME
Entry to homes will not be required during this project.
IN NEIGHBORHOOD
- Various machinery and equipment will be present in the neighborhood.
SCHEDULE
The projected schedule below is our best estimate as to when work will take place, but is only a projection. We will update this schedule approximately every week. Prior to work commencing on your home, you will receive a flyer with a definitive start date.
COMMUNICATION TIMELINE
We will communicate updates to this project through Door Hangers and Emails. For your convenience, a copy of all of these communications can be found below.
7/3/2024 | Project Overview | Email
7/3/2024 – Completion | Scheduled Flyer | Flyer